Request a Technical Proposal

A proposal comes back with a model number, the blast wheel layout, the installed power and the voltage we would build for — not a price list. The more of your workpiece we can see, the fewer emails it takes.

Contact Yufei Machinery

Bianduli Village, Wenmiao Town, Botou City, Cangzhou, Hebei, China
Open in Maps
Replies within one working day
China Standard Time, UTC+8
20,000 m² manufacturing facility, Botou, Hebei
Visit Verified Alibaba StoreChat on WhatsApp

Four details that turn a question into a proposal

The workpiece

Material, and the largest and heaviest single piece. A photo with a ruler in frame beats a written description.

The surface standard

SA 2.5 or SA 3.0, a Ra value, or the coating that follows. This decides wheel power and shot size.

The throughput

Parts per shift, or tonnes per month, and how many hours the machine will run.

The plant supply

Voltage, phase and frequency. Machines are wired and run at your voltage before shipment.

What buyers ask before the first quotation

How quickly will I get a reply?

One working day. Inquiries reach us by email and are answered in the order they arrive. If your message arrives late on a Friday in Europe or the Americas, the answer comes on Monday. If a drawing or photo is attached, the first reply usually includes a suggested model rather than a request for more information.

What should I send with the first message?

Five things let us size a machine without a second round of emails: the workpiece material, the largest and heaviest piece, the surface standard you must reach (SA 2.5, SA 3.0, or a Ra value), the throughput you need per shift, and your plant voltage and frequency. A photo of a part next to a ruler is often more useful than a description.

Can the machine be built for our plant voltage?

Yes. Machines are built for 380V, 415V, 440V, 460V, 480V, 600V or 220–230V at 50 or 60 Hz, and each unit is wired and run at that voltage in our factory before it is crated. Nothing has to be rewired or re-tapped on site, and no external transformer is needed.

Do you send engineers for installation?

For projects that need it, yes. Two engineers spent seven days in Surabaya on the Q3740 project — installation, commissioning, operator training and the first production runs — and a machine delivered to Uzbekistan was running within seven days of arrival. Simple installations are handled remotely: a Bangladeshi foundry installed a Q378 and a Q3210 themselves from our drawings.

What certification do the machines carry?

The company holds ISO 9001:2015, certified in January 2025, and CE certification to 2006/42/EC, granted in August 2025. Electrical components inside the cabinet are sourced from Schneider and Siemens for machines shipped to markets that require it.

Can we visit the factory before ordering?

Yes. The factory is in Botou, Cangzhou, Hebei — about two hours by high-speed train from Beijing. Visits are arranged in advance so the model you are considering can be run with your own workpieces while you are there.