Q326 vs Q3210: Choosing the Right Tumble Belt Size, Not the Biggest One
The difference between these two machines fits in one sentence: 200 kg per batch versus 600 kg. The decision takes a little longer. It depends on what you put in the chamber, how many times a shift you load it, and whether the extra capacity will actually get used.
The two numbers that decide it
Both machines belong to the same family — same working principle, same blast wheels, same controls. What changes is the size of the chamber and the belt, and therefore how much you can load in one cycle.
| Q326 | Q3210 | |
|---|---|---|
| Max load per batch | 200 kg | 600 kg |
| Typical parts | Small to medium castings, forgings, fasteners, hardware, aluminium die castings | Heavier castings and forgings, larger batch runs of the same parts |
| Where it fits | Job shops, mixed production, quick changeovers | Foundries and forges running one or two part families in volume |
| Where it hurts | Heavy parts and large batches: you spend the shift loading | Small batches: you pay for capacity the chamber never fills |
Both models accept workpieces up to roughly 600 x 800 mm. If a part fits through the opening but weighs 40 kg, you can still put five of them in a Q326 — 200 kg is a weight limit, not a size limit. That distinction matters more than most buyers expect.
What 200 kg looks like on the floor
Suppose your average part weighs 2 kg. A full Q326 batch is about 100 pieces. With a total cycle of six to eight minutes — loading, blasting, unloading — that is roughly seven batches an hour, or around 700 pieces, assuming the blast time suits the part.
Now suppose the same 2 kg part runs on a Q3210. A full batch is 300 pieces. You load three times less often. If your bottleneck is the operator walking parts in and out of the chamber, that is where the bigger machine pays for itself — not in the blasting itself, but in the labour around it.
These are illustrative numbers, not a guarantee. Blast time depends on surface condition, material and the finish you need. But the shape of the calculation is always the same: parts per batch multiplied by batches per shift.
When Q3210 is the wrong choice
We sell both, so there is no reason to pretend the bigger machine is always better. If your typical batch is under about 150 kg, a Q3210 spends most of its life half empty. The belt still turns, the wheels still throw shot, the dust collector still runs — you just pay for capacity that never gets used. Wear parts last by cycle, not by tonnage, so an underloaded machine wears out on schedule while producing less.
Floor space and power supply are the other two. A Q3210 needs a bigger footprint, a larger dust collector and a heavier electrical feed. In an existing workshop, those are often the real constraints — not the machine price.
When Q326 is the wrong choice
The opposite mistake costs more per part, and it is harder to fix later. If your parts are 10-15 kg castings and you need 3-4 tonnes a shift, a Q326 will run non-stop and still fall behind. You will add a second shift before you add a second machine, and the labour bill grows with it.
A useful rule of thumb: add up the weight of a normal production batch — not the heaviest part you occasionally run. If that number regularly lands above 150 kg, look hard at the Q3210. If it lands near 50-100 kg, the Q326 is the more efficient machine.
Three details buyers forget to compare
1. Loading and unloading time. On a small machine, the manual door and manual loading can take longer than the blasting. An automatic door with a PLC sequence is not a luxury on a high-cycle machine — it is the difference between six and nine batches an hour.
2. Voltage. We build both models for 380V, 460V, 480V and 220-230V at 50 or 60 Hz, and we test at your voltage before the machine leaves the factory. If a supplier quotes you a machine "for 380V" and leaves it there, ask how it will be tested.
3. Wear parts. Chamber liners, the belt, and blast wheel blades are consumables. Ask for the wear-part list and the price of each item before you sign. The machine price is a one-time number; the wear-part price follows you for years.
What customers actually did
Switzerland, 2026 — Q326. A powder coating line needed to clean parts before coating. The machine was built with a Siemens PLC and variable-frequency drives, and our engineer travelled to the site for installation. The customer watched the first production batch and said one word: "Perfect."
Sri Lanka, 2024 — Q326. The buyer flew to our factory and blasted his own castings on the machine before placing the order. He did not want a video of our test parts; he wanted to see his parts come out clean. That is the right way to buy a shot blasting machine.
Russia, 2026 — acceptance test. The customer went through the machine carefully at acceptance, checking the design and the blasting effect against what had been agreed. The machine has been running in production since.
Mexico — turbocharger parts. Small, relatively delicate castings that cannot be tumbled hard. The Q326 with adjusted blast parameters handles them without chipping edges.
How to settle it in one afternoon
Write down four things: the weight of a typical batch, the largest dimension of a typical part, how many batches you run per shift, and the surface standard you need to reach. Send them to us with a photo of the part. We will quote both models and tell you which one we would not sell you.
If you can send a sample part, even better. We will run it and send you the result before you commit to anything.
Two models, one decision
The Q326 is the machine most of our customers buy. The Q3210 is the machine the ones with heavier batches come back for. Tell us your batch weight and we will point you to the right one.
Questions buyers ask before choosing between them
Related: the Q326 model page, the tumble belt selection guide, which machine type fits your part.
Send Your Part DetailsRelated reading: the full tumble belt model guide covers Q324 through Q3220, including the two models we keep in stock. Real installations are on the customer cases page.