All applications

Shot blasting for structural steel: plate, H-beams and weld prep before painting

Structural steel arrives at the paint shop with mill scale still bonded to it, and scale is the reason shop primers fail two winters after the building goes up. A roller conveyor machine sits between the cutting line and the paint line and removes it in one pass, at a speed set by the coating specification rather than by the machine's maximum.

Mill scale is a coating problem, not a cleanliness problem

Hot rolling leaves a brittle oxide layer that looks acceptable and behaves badly: it is cathodic to the steel beneath it, so any pinhole in the paint becomes a small corrosion cell that lifts the coating from underneath. Painting over intact scale works until it does not, and by then the steel is already on site.

Rust grades matter as much as scale. Light, uniform rust on otherwise sound steel blasts off quickly. Pitted steel with laminations needs a higher standard and a longer dwell, and no machine setting will turn it into SA 3.0 if the pitting is deeper than the profile you are creating.

Sizing the machine to the profile, not to the tonnage

What you runMachine and setting
Profile up to 700 mm wideQ698 — 800 mm opening, 1,000 mm rollers
Plate 3–60 mm, in-line before cuttingQ698 at 0.5–4 m/min
Beams taller than 800 mmStep up to the Q6912 / Q6915 opening
Thin sheet that would sag on rollersWire mesh belt instead

The Q698 opens 800 mm wide and 100 to 1,000 mm high, on 1,000 mm rollers — the height is chosen, not fixed, because a shear line wants a low opening close to the blast pattern while a fabrication shop running H-beams wants the full metre. Buying the tall opening you will never use costs money twice: once in the machine, and again in air volume needed to keep it clear.

The throughput calculation nobody does before ordering

Conveyor speed and part length give the real capacity, and it is usually lower than the brochure number suggests. At 1.5 m/min, a 6 m beam takes four minutes to pass a single point, so a machine with one blast zone processes roughly fifteen beams an hour — before crane time, loading gaps and the fact that two beams cannot occupy the same metre of roller.

Wheel count is what buys speed at a given standard. More wheels, staggered horizontally and vertically along the pass, cover the strip more evenly and let the conveyor run faster for the same result; fewer wheels force a slower pass to avoid shadow bands between blast patterns. On a Q698 the range is four, six or eight wheels at 7.5 to 22 kW each, and the choice is driven by the standard and the required metres per shift — not by the maximum the frame can carry.

What the paint specification actually asks for

Most structural work is specified at SA 2.5 / SSPC-SP10 with a profile in the 40–85 µm band, because zinc-rich primers need an anchor pattern they can key into and will not bridge a surface that is too smooth. Blasting to SA 3.0 on structural steel is rarely money well spent: the extra cycle time buys a whiter surface, not a longer coating life, provided the profile is right.

The profile is the part that gets skipped. Two plates can both read SA 2.5 and differ by 40 µm of anchor pattern depending on abrasive size and wheel power — which is why a comparator photograph belongs at the machine, and a profile gauge belongs in the inspection.

Where structural lines go wrong after installation

Blasting before cutting. Cutting and welding burn the cleaned surface, and the weld zone is then either re-blasted by hand or painted over. Sequencing blasting after fabrication is cheaper than repairing it.

Roller marks on soft plate. Thin plate deflects between rollers and can pick up marks; support rollers and correct roller spacing fix it, and thin sheet often belongs on a mesh belt instead.

The crane is the bottleneck. A machine that can pass a beam every four minutes is useless if the overhead crane takes eight. Layout, not wheel power, sets the real output of a structural line.

Abrasive consumption climbing quietly. A worn separator returns broken shot to the wheel; cleaning slows, the operator raises the speed, and consumption doubles before anyone checks the separator. At 99.5% separation efficiency the circuit stays stable — that number is worth more than the wheel kilowatts.

Questions buyers ask about structural steel

Do I need a roller conveyor or a mesh belt?
Roller conveyor if the parts are stiff enough to span between rollers — plate from about 3 mm, beams, channels, angles. Mesh belt if the parts are thin, small, or must not touch each other. A shop that runs both usually has one of each rather than a compromise.
Can one machine handle plate and H-beams?
Yes — that is what the adjustable wheel positions and side-mounted wheels are for. What changes is the pass height and the wheel pattern; a machine sized only for flat plate will leave the web of a tall beam under-blasted.
Will blasting remove weld spatter?
Heavy spatter, no — it is chipped or ground. Light spatter and cutting slag come off with the scale. If spatter is a recurring problem, the fix is upstream in the welding parameters, not more wheel power.
How fast can the line run at SA 2.5?
On the Q698 the conveyor runs 0.5–4 m/min, and where it sits in that band depends on plate thickness, scale condition, wheel count and wheel power. A four-wheel machine at 11 kW each will not hold 3 m/min on 30 mm plate at SA 2.5; an eight-wheel build will.